PROCESSES

Drilling Procedures

Drilling and Testing Procedures

  • File permits
  • Build Location
  • Move rig on location and rig up
  • Drill surface hole and set surface casing
  • Complete drilling of the well
  • Log the well and run any other test that may be needed (i.e. cores, drill stem test, etc.)
  • Either plug the well as a non-producer or set and cement the casing.