Completion Procedures

Completion and Equipment Procedure

  • Move in work over rig
  • Run a cased hole bond log, gamma ray log, and collar locator
  • Run in the well bore with a perforating gun and perforate the well at the area of production
  • At this time stimulate the well if needed. Some wells need multiple stages of stimulation.
  • Run in the well bore with production tubing and set packer above producing zone
  • Flow well back
  • Test well for oil and gas production quality and quantity
  • Set-up storage tanks and stairwell, heater treater, tank battery, separator, water tanks, flow lines, meter loop, gas lines
  • Contract with gatherers for sale of oil and gas.